_edited.jpg)
EASY 54/107
EW54/107 – Compact and functional house with a spacious terrace
EW54/107 is a carefully thought-out standard house project that combines convenience and simplicity. With an internal area of 54 m² and a total area of 107 m², this house offers everything you need for comfortable living. It has one bedroom, a spacious living area with a combined kitchen, a bathroom and a technical room. A special charm is added by a 50 m² terrace, which provides additional space for relaxation and living in nature.
CONSTRUCTION SITE
132 m2
LIVING AREA
54 m2
TERRACE
50 m2

.png)

-
The living room (20.7 m²) is combined with the kitchen area (7.8 m²), creating an open and bright space.
-
One bedroom (12.6 m²) – a comfortable and cozy place to relax.
-
Entrance (3.5 m²) – a place for convenient storage and entry
-
A technical room (1.6 m²) and a bathroom (4.4 m²) provide practicality for everyday needs
-
Corridor and hall (3.6 m²) – fluid connectivity of spaces.
-
Spacious terrace (50.2 m²) – a great place for relaxation and outdoor activities.
This house is ideal for couples or as a holiday home, offering comfort and harmony with the surroundings. It is also perfect for renting out in a picturesque location where guests can enjoy a peaceful retreat.
Minimalist and thoughtful organization of the spaces provides a comfortable living environment, while natural materials and large windows give the home a warm atmosphere and allow you to enjoy a steady flow of natural light throughout the day.
The spacious 50.2 m² terrace becomes the main relaxation area – ideal for al fresco dining, relaxing with a book or simply enjoying the silence. This house offers functionality and aesthetics that suit a modern lifestyle.
The interior is distinguished by the natural warmth of wood and modern aesthetics. The load-bearing structures, which ensure high visual quality, can be painted in accordance with the interior concept or selected with a veneered finish, giving the rooms a special elegance. This approach creates a smooth, aesthetically appealing result that is difficult to achieve with other materials.
The exterior of the house stands out with a modern and elegant design, offering a spacious and open feel. The large overhangs provide protection from the sun and weather, while giving the house a sophisticated visual appearance. The 51 m² terrace is a great place to relax, allowing you to fully enjoy the surroundings. Large windows provide abundant natural light, while the structured facade gives the house a dynamic and modern character. The green niches near the house create a livable and harmonious environment, making the exterior even more attractive and closer to nature.
BASIC PROJECT
85,900 EUR
Price includes VAT
BASIC PROJECT
119,800 EUR
Price includes VAT 21%
FULL PROJECT
189,100 EUR
Price includes VAT 21%
PROJECT DEVELOPMENT
Project development and coordination with the building authority
GLT BUILDING LOAD-BEARING STRUCTURES
External walls ( 100mm)
Internal walls (75 mm)
Roof construction. ( Lathing, film)
Connections, tapes
*UNPAINTED STRUCTURES
WINDOWS AND EXTERNAL DOORS
Wooden windows with structured glass facade (UV average value ~ 0.4 ( Wm2K))
Exterior door - Wood, glass composite
INSTALLATION ON SITE
PROJECT DEVELOPMENT
Project development and coordination with the building authority
GLT BUILDING LOAD-BEARING STRUCTURES
External walls ( 100mm)
Internal walls (75 mm)
Roof construction. ( Lathing, film)
Connections, tapes
*UNPAINTED STRUCTURES
WINDOWS AND EXTERNAL DOORS
Wooden windows with structured glass facade (UV average value ~ 0.4 ( Wm2K))
Exterior door - Wood, glass composite
PROJECT DEVELOPMENT
Project development and coordination with the building authority
GLT BUILDING LOAD-BEARING STRUCTURES
External walls ( 100mm)
Internal walls (75 mm)
Roof construction. ( Lathing, film)
Connections, tapes
*UNPAINTED STRUCTURES
WINDOWS AND EXTERNAL DOORS
Wooden windows with structured glass facade (UV average value ~ 0.4 ( Wm2K))
Exterior door - Wood, glass composite
BUILDING EXTERIOR FACADE AND ROOF
Insulation
(Walls - Kingspan kooltherm 80 mm)
Lattice
Finishing boards (wood trim)
Insulation
(Roof - rock wool - 300 mm)
Roofing
(PVC roofing)
Roof overhangs
( thermal wood - terrace ceiling,
Roof edge -cement fiber sheet)
Terrace (thermal wood)
Rainwater drainage system
CONSTRUCTION OF THE FOUNDATIONS
Construction of foundations at the site
External engineering networks and communications
INTERNAL ENGINEERING NETWORKS AND SMART HOME
Heating - Underfloor heating
(Air/water recovery)
Ventilation (Air recovery system)
Electrical installations
Water and sewerage
INTERIOR
Interior doors (veneered interior doors)
Wall decoration (Veneered walls)
Tiled bathrooms
Ceiling (gypsum)
Floor (tile and hardwood parquet)
BUILDING EXTERIOR FACADE AND ROOF
Insulation
(Walls - Kingspan kooltherm 80 mm)
Lattice
Finishing boards (wood trim)
Insulation
(Roof - rock wool - 300 mm)
Roofing
(PVC roofing)
Roof overhangs
( thermal wood - terrace ceiling,
Roof edge -cement fiber sheet)
Terrace (thermal wood)
Rainwater drainage system
INSTALLATION ON SITE
CONSTRUCTION OF THE FOUNDATIONS
Construction of foundations at the site
External engineering networks and communications
INTERNAL ENGINEERING NETWORKS AND SMART HOME
Heating - Underfloor heating
(Air/water recovery)
Ventilation (Air recovery system)
Electrical installations
Water and sewerage
INTERIOR
Interior doors (veneered interior doors)
Wall decoration (Veneered walls)
Tiled bathrooms
Ceiling (gypsum)
Floor (tile and hardwood parquet)
BUILDING EXTERIOR FACADE AND ROOF
Insulation
(Walls - Kingspan kooltherm 80 mm)
Lattice
Finishing boards (wood trim)
Insulation
(Roof - rock wool - 300 mm)
Roofing
(PVC roofing)
Roof overhangs
( thermal wood - terrace ceiling,
Roof edge -cement fiber sheet)
Terrace (thermal wood)
Rainwater drainage system
CONSTRUCTION OF THE FOUNDATIONS
Construction of foundations at the site
External engineering networks and communications
INTERNAL ENGINEERING NETWORKS AND SMART HOME
Heating - Underfloor heating
(Air/water recovery)
Ventilation (Air recovery system)
Electrical installations
Water and sewerage
INTERIOR
Interior doors (veneered interior doors)
Wall decoration (Veneered walls)
Tiled bathrooms
Ceiling (gypsum)
Floor (tile and hardwood parquet)
INSTALLATION ON SITE
Basic project interiors
Basic project interiors
Full project interiors
*Furniture, interior items, lighting fixtures not included in the price.
ADDITIONAL SERVICES
Painting of the load-bearing structure of the GLT building
Standard interior design of the building
Terrace landscaping
PROJECT STAGES
1
2
3
Meeting with EASYWOOD
Agreement on the project. Conclusion of the contract.
Advance payment for project development
Development time 1 - 3 months
Project developed. Coordination with the building authority, receipt of a building permit
Coordination up to 12 months, depends on the municipality
Construction production
-
Advance payment Part 1. Before starting the production of structures
-
Construction production Production time 2 - 4 months
-
In parallel with the production process, foundation construction begins
Assembly
-
Agreement on the start of construction assembly
-
Advance payment 1st part for the assembly of the structure
-
On-site assembly
-
Advance payment Part 2 After assembly of the structure
-
Advance payment part 2. After construction
Apply for a consultation